With Regards to foundation column formwork,
is it ok to use concrete blocks connected by cement?
it is used as the replacement for timber.(i have tried to find a webpage that describes this as an ok method, sadly there were none.)
lastly it would not be removed after pouring. was wondering if this is ok?
attached below is the structure of the concrete blocks, imagine this as enclosing(before concrete is poured, its placed for it to retain its shape).
to clarify this would be the pillar buried underground. and only the part buried underground uses this, the top part is wood.
I have read from this site:
https://theconstructor.org/building/formwork-shuttering/types-of-formwork-shuttering/3767/