[F.6 MATH] Arithmetic Sequence Application?

2016-09-08 2:44 pm
There are 15 machines in a factory.A worker takes 10 minutes to start up one machine.The first machine starts at 2:00 p.m. and so on. Each machine produces 2 kg of machine in 5 minutes.All machines stop production at 6:00 p.m.

a) Find the production time in minutes for the first second and third machines each from 2:00 p.m. to 6:00 p.m.

b) Find the production time in minutes for the last machine from 2:00 p.m. to 6:00 p.m.

c)find the weight of material in kilograms produced by all the machines from 2:00 p.m. to 6:00 p.m.

回答 (2)

2016-09-08 8:59 pm
✔ 最佳答案
(a)
Let Tn denote the production time in min. for the n-th machine
T1 = (6-2)*60 = 240
T2 = 240 - 10 = 230
T3 = 230 - 10 = 220

(b)
Tn = 240 - 10( n - 1 )
T15 = 240 - 10( 15 - 1 ) = 100

(c)
2*(240/5) + 2*(230/5) + ...... + 2*(100/5)
= (2/5)( 240 + 230 + ...... + 100 )
= 0.4 * (240+100)*15/2
= 1020

Ans :
(a) 240, 230 and 220 min respectively.
(b) 100 min
(c) 1020 kgs
2016-09-08 6:20 pm
歡迎各位知識友提出您對這題問題的疑惑、意見或部分答案
現時最佳解答百分比為 0%

編號:201609090120
如對是次建立的「意見欄」有任何問題,請立即到「2016 年 9 月意見集中營」裡留言,多謝合作!
了解建立「意見欄」的目的:https://hk.answers.yahoo.com/question/index?qid=20160825090051AANjt2N


收錄日期: 2021-05-02 14:10:58
原文連結 [永久失效]:
https://hk.answers.yahoo.com/question/index?qid=20160908064437AAM75L7

檢視 Wayback Machine 備份