✔ 最佳答案
1/
Install FCU: suspend by 3/8 dia threaded rod. Supply and install 50mm dia and 40mm dia G.I. pipe for chilled water connectionto FCUs c/w fiberglass insulation, and supply and install pvc condensate drainpipe c/w insulation. Supply and installrunning hour meter and filter clog indicator.
2/
Supply and install electrical wiring c/w conduit from MCB board to FCUs andsupply and install Johnson Controls thermostat controller.
3/
Supply and install G.I. supply air duct for FCU to defined location accordingto customer specification. Connect freshair duct to FCUs. Supply and installreturn air duct plenum and air louver c/w filter.
4/
Supply and install G.I. air duct for exhaust fan from above ceiling at the shopentrance to the bar area according to customer specification.
5/
Supply and install supply and return “chilled”(出入水是否指冷氣的涷水喉?) water supply and carry out hydrostatic pressure testto 200kg(請查證測試的指標應該不是kg吧 - ?kPa)。Carry out water pipe cleaning and water sampletest.
6/
Provide Ventilation Certificate of Compliance: MVACPlan, Air Flow Data, and submission of Form D by a Registered VentilationContractor.