✔ 最佳答案
The A. entire room (makes project 1 to make
the white paint tempered glass newly) 2 to make store Fang Mumen
newly in the classroom inner wall body frame 1 set 3 newly
to make the open style reception room glass newly to be separated the continually 2 sets
4 newly to make the reception room door to innermost chambers of nobleman's palace 2 set of
5 new shop platform PVC rubber matting (the public position and the Reception position)
6 new shop platform square shape rug (store room and office)
7 makes the wood grain not loose floor and the foot line newly (classroom and reception room)
B. (vacation smallpox)
8 makes Reception Area vacation smallpox 9
to make and the installment planetarium flower decorative lighting newly newly illuminates
10 to make air conditioning Fan coil and the wind trough newly,The difference wind direction 2 sets
11 pack all all wind trough heat insulation cotton and kapok and clean Fan coil to separate this world and to disinfect
12 to make the classroom plaster tablet vacation smallpox. (not to have
newly to make plaster tablet smallpox) including lamp trough C
13 smallpox A. shovel bottom B. to make moisture-proof oil C. to approve the ash smallpox oil after gypsum ash patching
crack D. (ICI Dulux) mute surface latex paint
14 new supply school all new desks and the study chair
15 supply the special design furniture 16
to make Reception Counter newly advertisement D
. (electric power project) 17
to add or the change position 20mm electric lamp system position and telephone each group of $700 Yuan E
newly. (paint project)
18Wall body A. shovel bottom B. makes moisture-proof oil C. to approve the ash wall body with gypsum ash patching
crack D. (ICI Dulux) half mute latex paint or mounts the wallpaper (office)
F. (window project)
19 to make and to install window G
newly. (other projects)
20 project period shop 2/8 spatial board to do protects
2014-07-22 18:01:22 補充:
a