✔ 最佳答案
A. The Main (new projects)
A glass of new white paint baking in the classroom walls
2 of new store room doors with frame 1 set
3 reception room of new open space 2 sets of glass
4 new office reception room door two sets of road trips
5 new shop floor PVC plastic mats (public position and Reception Location)
6 new shop floor carpet squares (store room and office)
7 None of new wood flooring and skirting Punta (classrooms and meeting rooms)
B. (false ceiling)
8 false ceiling of new Reception Area
9 new creation and installation of false ceiling lighting
10 of new air-conditioning Fan coil and ducting, bit 2 sets out the wind
All 11 repack all cotton insulation and air duct cleaning Fan coil dust filters and disinfection
12 of new classrooms gypsum board false ceiling with light tank
C. (without making gypsum board ceilings)
13 A. shovel bottom B. Smallpox moisture oil made of gray plaster repair cracks C. D. Pihui
Smallpox oil (ICI Dulux) matte paint
14 new school supplies and learning all the new desk chair
15 new supply special design furniture
After the 16 signs of new Reception Counter
D. (power projects)
17-bit add or change a bit 20mm lamp system and telephone in each $ 700 yuan
E. (paint program)
A. B. shovel bottom 18 walls made of gray plaster moisture oil patch cracks C. D. Pihui
Walls (ICI Dulux) semi-matte paint or wallpapering (office)
F. (Curtain Project)
19 new creation and installation of curtain
G. (other items)
Shop 2/8 hollow plate for protection during the 20 projects
21 engineering consultant regular monitoring and inspection
After the completion of the indoor basic cleaning services 22
23 government-designated material disposal projects
24 A third party liability insurance contract
Gypsum board ceilings do not need
Items A, C, D, E, F, G
Gypsum board ceiling needs to be done
Items A, B, D, E, F, G