Discuss what time step delta t would be the best for this problem. so...how do i determine which one is better..?

回答 (1)

2010-05-30 6:27 am
✔ 最佳答案
Please download the data file:
http://www.funp.net/902374

圖片參考:http://img571.imageshack.us/img571/4361/69247720.png


2010-05-30 19:56:17 補充:
For delta t = 0.1 - 0.8, the amplitude of the calculated speed follows closely with the actual speed. For increased value of delta t, the noise level is lowered. So delta t=0.8 is a good choice. For delta t=2.4, the calculated speed is significantly lower than the actual.