請各位幫忙翻譯:

經過承建商與我們實地考察後,我們品質監察組有以下意見:
1) 在圖一所顯示,頂部鋁塑版沒有牢固在圍牆上,需要再進行牢固拉緊;
2) 在圖二A點位置並非如圖則一樣45度角,需再調節;
3) 在圖三B點位置並沒有密封,需將其封密;
煩請跟進以上各點,以便儘早安排工程進行。

回答 (7)

2009-11-28 1:04 am
✔ 最佳答案
MY SUGGESTION:

After a site visit with the contractor, our Quality Control Division has following comments:

1/ As shown in Diagram 1, the aluminum mold board was not firmly fixed on the surrounding walls. It has to be fastened and fixed firmly.
2/ Position A in Diagram 2 was not installed at 45 degree as stipulated in the draft. It needs to be adjusted.
3/ Position B in Diagram 3 had not been sealed. It needs to be sealed.

Please take follow-up actions for the points above so that we can arrange processing the project as soon as possible.
2009-11-28 12:37 am
After contractor for the construction and we investigate on the spot, it has the following opinions that our quality controls the group:
1) Reveal in Fig. 1, it is not firm on the enclosure that the aluminium of top is moulded edition, need straining firmly;
2) If in Fig. two A some positions if the same angle of 45 degrees of picture, need to regulate again;
3) Three B some position seal in Fig., need until it copy dense;
Please follow up the above-mentioned points, in order to arrange for the project to go on as soon as possible.
2009-11-27 11:30 pm
After the contractor with our field visits, we monitor the quality group, the following observations:
1) in Figure 1 shows that the top aluminum version is not firmly on the wall, need to be firmly stretched;
2) in Figure 2 A point location is not shown is the same as a 45-degree angle, should be subject to adjustment;
3) in Figure 3 B point position is not sealed, must be sealed;
Follow-up should be grateful if the above points in order to arrange the works as soon as possible.
2009-11-27 11:20 pm
After on the spot investigating with us after contractor, our quality inspects a set to have a following opinion:
1) Suggest in the figure 1, the coping aluminum Su version has no firm on the fence, need to be carried on again firm tense;
2) In the figure two As order position not as diagram then similar 45 degrees corn, need to regulate again;
3) Ordered position and don't seal completely in the figure three Bs, need to seal it airtight;
Please follow above at all point, in order to as early as possible arrange engineering to carry on.
2009-11-27 10:18 pm
After our land survey with the distributor, our quality surveillance group suggests:
1) in diagram one, the aluminium plastic board on top is not fastened on the wall, and need to be fastened
2) in diagram two, the position of point A need adjustments to meet 45 degrees, as the diagram shows.
3) in diagram three, the position of point B is not sealed, and need to be sealed.
Please follow the above points, and ensure the arrangement of construction on schedule.
2009-11-27 9:50 pm
After the contractor with our field visits, we monitor the quality group, the following observations:
1) in Figure 1 shows that the top aluminum version is not firmly on the wall, need to be firmly stretched;
2) in Figure 2 A point location is not shown is the same as a 45-degree angle, should be subject to adjustment;
3) in Figure 3 B point position is not sealed, must be sealed;
Follow-up should be grateful if the above points in order to arrange the works as soon as possible.
2009-11-27 7:11 pm
After construction business after our on-the-spot investigation, our quality supervision group has the following opinion:
1) One demonstrated in Figure that the crown aluminum models the version not reliably in the fence, needs to carry on the reliable tautness again;
2) In the Figure two A position like chart same 45 degree angles, must adjust again by no means;
3) Has not sealed in the Figure three B position, must its dense;
Requests to follow up the above each spot, with the aim of arranging the project to carry on as soon as possible.