15分中文翻譯英文 == MY ASSIGNMENT ==

2008-05-15 10:15 am
貨期表的跟進

慣常性當我們收到(貨期表)從不同的生產國時,我都便會把這些的報告轉給C部門作Data input 去 BBB系统內。在完成輸入之後,我便會透過BBB系统去下載有關最新貨期資料往Qfile作貨期跟進之用。

以下的摘要是提供給予我們的貨期表從不同的生產國:
- A, D, E 生產國 : 每星期(一次)
- B 生產國 : 每兩星期(一次)
- C, F 生產國 : 每月(二次)

目的:
1. 如發覺在當時提供的送貨日期已延誤,導致沖擊到原定的貨品促銷期,我就便會要求向生產國作出有關改善。
2. 在提供的送貨日期內,發現生產國仍然還未有適當的配合程序,例如:沒有(MMM report)﹔或沒有(SSS report)等 支持相關的送貨日期,我們都要向生產國去仔細地查証一吓,以避免使顧客告成不必要之誤會。

回答 (3)

2008-05-15 1:01 pm
✔ 最佳答案
THE WORKS OF FOLLOWING UP THE SHIPMENT SCHEDULES
When receiving the shipment schedules from the different manufacturing countres, I will transfer those details to C Department, letting them to make the data input at BBB system. After their completion, I will then, download the relevant latest information to Q file for my work purpose as to follow up the shipment schedules.
Below is the summary of the different manufacturing countries, which provide the shipment schedules to us.
- Manufacturing countries A, D, E, : once a week
- Manufacturing countries B: once every two weeks
- Manufacturing countries C, F,: twice a month
OBJECTIVE; --
1) If the suggested shipment date shows a delay from the original shipment date, it would cause big impact on the date of the goods' promotion. So, I will ask the relevant manufacturing countries to make improvement.
2) During the period before the suggested shipment date, if there is improper arrangement from the manufacturing countreis, such as, without MMM report, or, without SSS report, that makes impossible to work with the shipment date, we will verify those contradictions with the manufacturing countries, as to avoid the unnecessary misunderstanding from our customers.
2008-05-15 4:58 pm
[己幫你中文翻譯英文]:
Goods time table following up

Regularly when we receive (goods time table) from the different
production country, I all then can forward to these reports the C
department to do Data input to go BBB am in. After completes the
input, I then can penetrate BBB am download the related most new
goods time material to make the goods time toward Qfile to follow up
it to use.

The below abstract is provides gives our goods time table from the
different production country: - A, D, E production country: Each week
() - B production country: Every two weeks () - C, F production
country: Each month (two)

Goal: 1. like detected at that time provided delivers goods the
date to delay, causes to attack the original goods promotion time, I
can request at your convenience to the production country to make the
related improvement. 2. in provides delivers goods in the date,
discovered the production country has not still had the suitable
coordinate procedure, for example: Not (MMM report) ﹔ Or related
does not have (SSS report) and so on the support to deliver goods the
date, we all must go to the production country carefully verification
one , avoids causing the customer not to be brought to a successful
conclusion misunderstanding the necessity.



[[[希望可以幫到你]]]
2008-05-15 1:58 pm
Follow up work in Delivery Schedule
The usual practice is that whenever we receive Delivery Schedule from different manufacturing countries, I will forward these report to C Department for data input into BBB system. Upon C Department’s completion of data input, I will download the latest delivery information from BBB system to Q file for follow up on the delivery schedule.
Following are summary of Delivery Schedule supplied to us from different manufacturing countries :
- Country A, D, E : Once every week
- Country B : Once every 2 weeks
- Country C, F : Twice every month
Our goal :
1. At time of receiving the delivery schedule when I notice that a delivery will be delayed, which in turn affect the originally established promotion period of the goods, I will require the manufacturing country to react correspondingly and improve the delivery plan.
2. When we notice that at the period which is specified on the delivery schedule and the manufacturing country still does not provide appropriate co-ordinating procedures to maintain the related delivery schedule such as : Absence of MMM Report, or absence of SSS Report, etc., we will check and confirm with the manufacturing countries. This is a follow up to make sure there will not create unnecessary misunderstanding with or inconvenience to the customers.