急,,,中釋英,,求好心人幫忙

2007-12-28 3:46 am
競技游泳源於19世紀中期的英國及澳洲,1837年英國游泳協會成立,開創了近代游泳競賽的歷史。1869年,英國業餘游泳總會成立,這是世界第一個國家游泳總會。二十世紀初,世界各國的游泳比賽開始普及,1894年6月16日,在巴黎成立國際奧林匹克委員會時,游泳被列為1896年的奧運會項目。1908年,國際業餘游泳聯合會(FINA)成立。

[編輯] 歷史
北京國家游泳中心是為北京奧運而新建的體育場,工程於2003年12月24日正式展開。在工程開始前,北京市規劃委員會舉行了建築設計競賽,以選出北京奧運時的水上項目比賽場館。

[編輯] 外形及內部
北京國家游泳中心表面看如一個裝滿水的立方體,在外牆上安裝了面積大小不一、鍍點不同的膜結構。當中,共動用了3000剩的膜結構以覆蓋10萬平方米的外牆﹔而膜結構的鍍度不一,可使光捷射角度改變,減少場館室溫高而增加用電的形況。

另外,國家游泳中心的總建築面積為6.5萬至8萬平方米,地下部分的建築面積不少於15000平方米,內除設多個游泳池、跳台、永久座席6000個、臨時座席11000個外,還包括隨隊官員區、競賽管理區、貴賓區與媒體區。

回答 (2)

2007-12-28 3:55 am
✔ 最佳答案
Athletics swimming source in the 19th century intermediate stage's Britain and Australia, in 1837 the British Swimming Association establishes, founded the modern swimming competition history. in 1869, the British extra-curricular swimming general meeting was tenable, this was the world first country swimming general meeting. at the beginning of the 20th century, various countries' swim meet starts to popularize, on June 16, 1894, established the International Olympic Committee when Paris, swims is listed as 1896 the Olympic Games project. in 1908, the International Extra-curricular Swimming Federation (FINA) was founded.

[edition] the historical Beijing country swimming center is for Beijing Olympic Games, but the newly built stadium, the project launched officially in December 24, 2003. Before the project starts, Beijing Plan Committee has held the architectural design competition, selects time Beijing Olympic Games' aquatic project competition facility.

[edition] the contour and the internal Beijing country swimming center surface looked that like packs the water the cube, installed the area size in the outer wall to vary, to plate the different membrane structure. Middle, altogether used the membrane structure which 3000 remained to cover 100,000 square meters outer walls ﹔, but the membrane structure plated varies, might cause light Czechoslovakia to shoot the angle change, reduces shape situation which the facility room temperature high increased uses electricity.

Moreover, the national swimming center's total floor space is 65,000 to 80,000 square meters, underground portion's floor space many in 15000 square meters, in except supposes many swimming pools, the diving platform, permanent to attend a banquet 6000, to attend a banquet temporarily outside 11000, but also includes along with the team official area, the competition administrative district, the distinguished guest area and the media area.

希望帮到你啦!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
2007-12-28 5:03 am
Athletics swimming source in the 19th century intermediate stage's Britain and Australia, in 1837 the British Swimming Association establishes, founded the modern swimming competition history. in 1869, the British extra-curricular swimming general meeting was tenable, this was the world first country swimming general meeting. at the beginning of the 20th century, various countries' swim meet starts to popularize, on June 16, 1894, established the International Olympic Committee when Paris, swims is listed as 1896 the Olympic Games project. in 1908, the International Extra-curricular Swimming Federation (FINA) was founded.

[edition] the historical Beijing country swimming center is for Beijing Olympic Games, but the newly built stadium, the project launched officially in December 24, 2003. Before the project starts, Beijing Plan Committee has held the architectural design competition, selects time Beijing Olympic Games' aquatic project competition facility.

[edition] the contour and the internal Beijing country swimming center surface looked that like packs the water the cube, installed the area size in the outer wall to vary, to plate the different membrane structure. Middle, altogether used the membrane structure which 3000 remained to cover 100,000 square meters outer walls ﹔, but the membrane structure plated varies, might cause light Czechoslovakia to shoot the angle change, reduces shape situation which the facility room temperature high increased uses electricity.

Moreover, the national swimming center's total floor space is 65,000 to 80,000 square meters, underground portion's floor space many in 15000 square meters, in except supposes many swimming pools, the diving platform, permanent to attend a banquet 6000, to attend a banquet temporarily outside 11000, but also includes along with the team official area, the competition administrative district, the distinguished guest area and the media area


收錄日期: 2021-04-14 10:58:38
原文連結 [永久失效]:
https://hk.answers.yahoo.com/question/index?qid=20071227000051KK04025

檢視 Wayback Machine 備份