各位師傅請幫忙翻英文:
1. 拆光管及降低 5 呎再安裝, 用鐡喉, 連加長電源線 4組
2, 拆原有 5 呎光管:更換全新 5 呎防水光管 (用喜萬年不碎膠) 7套
3, 拆 2 呎光管, 更換全新 2 呎防水光管 1套
4 4呎孖燈盤光管, 檢查及更換火牛 二隻

5, 更擙電水礃
牌子:聯品 三相電 6KG 20加侖 座枱式
安裝:拆原有舊水礃, 裝回新水礃, 駁回水, 駁回來電

回答 (2)

2007-12-14 7:52 pm
✔ 最佳答案
1.Opens the fluorescent tube and reduces 5 feet to install again, with the throat, including lengthens the power line 4 groups.

2.Opens the original 5 feet fluorescent tubes: Replaces the brand-new 5 foot waterproof fluorescent tube (to use happy ten thousand year not garrulous rubber) 7 sets.

3.Opens 2 feet fluorescent tubes, replaces the brand-new 2 foot waterproof fluorescent tube 1 set.

4.4 feet double lamp panels fluorescent tubes, inspection and replacement fire cow two set.

5. Changing battery acid
Sign: Association three-phase electricity 6KG 20 gallons places table types
Installment: Opens the original old water paddle, installs the new water paddle, refutes the backwater, rejects the electricity
2007-12-15 5:21 am
1. Take down existing fluorescent batten and re-install at a level 5" below the original position, c/w G.I. conduit and associated wiring works : 4 sets
2. Take down and cart away existing 1 x 5" fluorescent batten, supply & install new 5" water-proof fluorescent batten c/w "Sylvania" vandal-resistant plastic casing : 7 sets
3. Take down and cart away existing 1 x 2" fluorescent batten, supply & install new 1 x 2" water-proof fluorescent light fitting : 1 set
4. Check existing 2 x 4" lighting panels and replace ballast : 2 nos.
5. Replacement of electric water boiler:
Model: "Luen-Pun" 3-phase, 6Kg, 20 Gallon tabletop water boiler
Installation works: Take down and cart away existing water boiler, supply and install new electric water boiler, including reconnection of water and electricity supply.