✔ 最佳答案
Working experience:
The nonstandard design centre of equipment department of the east wind automobile, is engaged in the mechanical maintenance of the numerical control equipment from July of 2006 to Janu ary of 2007, to the thing that import equipment and gearbox are surveyed and drawn , allocate quick-wear parts, and purchase the equipment to confirm to relevant outside, help the foreign expert to produce a gleam of and coordinating a domestic technical staff and produci ng the work, and research and develop and design the nonstandard equipment independently.
Will it be January 2007 east wind automobile research and development centre so far, engaged in gear wheel axle part corresponding to analyse and design mainly, analyse and design the whole structure of the gearbox, help eight or nine shelves of heavy-duty gearboxes of Austrian expert's optimization design, carry on PRO-E foundation to train in entering factory's technician newly.
Obtain the condition of the certificate of merit:
1.Get automobile limited company of east wind and pamper imagination on the seventh place of Karaoka disc song match of youth in June of 2007;
2.Get automobile limited company of east wind and design the achievement to show the first place nonstandardly in November of 2006;
3.Will obtain institute's football match top scorer's award in 2004;
4.CS will fight the team and get the last 16 before the playing area of Beijing in 2004;
5.Will obtain the school and study the second-class scholarship in 2003;
6.Iced the pioneer's orchestra's match performance award of the campus of strength in 2002